Penetron Protects 4,000 m³ Raft Foundation at Al Rajhi Project, Makkah, Saudi Arabia
Penetron is proud to protect the 4,000 m³ raft foundation of the Al Rajhi Project in Makkah.
PENETRON ADMIX was dosed at the batching plant, building crystalline waterproofing into every cubic metre as the concrete was produced, with no sheet membrane and no additional trade after the pour.
Its non toxic, non staining green tracer showed on the concrete surface during bleeding, giving live confirmation on site that the admixture was in the mix, before disappearing without leaving a mark.